Cover note: what is in this pack and what to do with it

Fourteen documents, plus this note, that answer before it is asked almost everything a UK housebuilder, contract caterer or facilities management company puts to a supplier during onboarding. None of it is legal advice, and three documents must go to a solicitor before you use them once. Page 2 records what was verified and what was not.

What is in the pack

DocumentPagesBefore useWhat it is for
data-processing-agreement10solicitorUK GDPR Article 28 terms, you as processor, with annexes for the processing detail, the security measures and the sub-processors. Offer it; do not wait for theirs.
terms-of-service-outline8solicitorInstructions to counsel: every clause your subscription terms need, and suggested wording. Never send this to a customer.
pilot-agreement3solicitorThe £2,500 60-day proof of reach, with the four success criteria, the refund promise and the year-one price on the paper.
security-summary2issue as isSent unprompted after the demo, this turns a six-week IT queue into a two-week one.
supplier-questionnaire-answer-bank6internalThe 60 questions UK buyers ask most, answered from your actual stack.
cyber-essentials-checklist4internalThe five controls mapped to Laravel on AWS via Forge plus laptops, and where the automatic fails are.
policies/ health and safety, modern slavery, anti-bribery, equal opportunities, quality, environmental, information security, business continuity1 eachsign and dateThe eight one-pagers a supplier form asks for. Fill the brackets, sign, keep them in one folder: every item you cannot produce on the day adds one to three weeks to a deal.

The three that must go to a solicitor, and why

Send all three in one instruction: they share definitions and cross-refer, and one instruction is materially cheaper than three. Budget [£1,500 to £3,000] for a solicitor qualified in England and Wales. The DPA, because it creates statutory obligations you cannot vary, because its liability, audit and sub-processor clauses are what a customer's counsel redlines, and because Chapter V of the UK GDPR was rewritten on 5 February 2026 so older templates cite repealed provisions. The terms of service, because your liability cap sits on your own written standard terms and is subject to the reasonableness test in s.3 of the Unfair Contract Terms Act 1977: a cap set badly can be struck out entirely, leaving you uncapped. Start from Bonterms or Common Paper, never a US template. The pilot agreement, because it is the first paper a plc division signs and it carries a refund promise, an incorporated DPA and a liability cap.

The other twelve documents do not need a solicitor. They need accurate numbers, which is a different and more urgent problem.

The order to do this in

#Do thisElapsedWhy in this position
1Fill in the company basics and buy the insurance: company number, VAT position, registered office, ICO registration, bank details, named contacts, and cover at the limits your targets require.1 to 3 daysEvery other document has these in square brackets, so doing it once completes them all. Raising an insurance limit mid-procurement costs about three weeks: buy it before you are asked.
2Start Cyber Essentials. Read the Danzell question set free first, fix the gaps, then pay the £320 plus VAT.1 to 3 weeksLongest lead time here and the item most frequently demanded. It is on the critical path of your first housebuilder deal. Start it today.
3Measure the numbers marked [verify]. Run a timed restore drill; confirm backup frequency and retention; record the restore test date; decide the penetration testing position.2 to 3 daysThese block the security summary and the answer bank, the two documents that actually shorten deals. A wrong answer here is worse than a slow one.
4Sign and date the eight policies, publish the modern slavery statement, and instruct the solicitor on the DPA, the terms and the pilot agreement together.1 day, then 1 to 2 weeksThe policies depend on nothing else and a supplier portal will refuse to progress without them. The solicitor's work runs in parallel with Cyber Essentials, so start it the same week.
5Publish the sub-processor list, the terms and the DPA at stable, versioned URLs, then send the security summary unprompted after every demo.1 day, then ongoingThe DPA and the order form incorporate documents by URL, so those URLs must exist. Sending the summary unprompted is the habit that compounds.

What was verified, and against what

Every regulatory reference was checked against the primary source on 28 August 2026, not against secondary commentary. The material findings, several of which correct what is in general circulation:

What could not be verified, and what you must confirm yourself

This pack is not legal advice, and nothing in it creates a solicitor and client relationship. It is a set of well-researched drafting aids and internal checklists. The data processing agreement, the terms of service built from the outline, and the pilot agreement must each be reviewed by a solicitor qualified in England and Wales before first use, and re-checked whenever the sub-processor list, the hosting arrangement or the law changes. Primary sources throughout, all checked 28 August 2026: legislation.gov.uk; ico.org.uk; ncsc.gov.uk and iasme.co.uk; dataprivacyframework.gov; hse.gov.uk; gov.uk. Each document carries its own source line in its footer.